
SECTION 3 CONSTRUCTION
24
[ ] Install the 7805 regulator at U2 (3A-4A) using the
heat sink and the #6 hardware. Use the needle-nose
pliers to bend the 7805 leads before mounting it.
Mount the regulator on the heat sink first, then
solder.
[ ] Install the 2N2907A transistors at U5 (2K-2L) and U8
(U1). Use two TO-18 spacers at this time.
[ ] Install the 2N2222A transistor at U7 (U1). Use a TO-
18 spacer when mounting.
[ ] Install the 79L12 regulator at U6 (4B). Align part as
shown in silkscreen.
[ ] Install the 8.000 Mhz xtal at Y1 (3L).
[ ] Install switch at S1 (3F-3H).
[ ] Insert the DOUBLE D controller card into an S100
mainframe. Turn on the power switch an check the
following voltages.
[ ] U2 has +5 volt output.
[ ] U1 has +12 volt output.
[ ] U6 has -12 volt output.
[ ] THE FOLLOWING STEPS ARE FOR 8" DRIVES.
ECN#2 [ ] Install a
10k resistor (Brown-Black-Orange) at
R1 (1A).
ECN#2 [ ] Install a
18k resistor (Brown-Grey-Orange) at R3
(1A).
ECN#2 [ ] Install a
15k resistor (Brown-Green-Orange) at
R4 (1A).
[ ] Install a 6.2K resistor (Blue-Red-Red) at R6
(OL).
[ ] Install a jumper wire from "CLK" to "8" in the
CLOCK SELECT BLOCK near ICs 2L-2M.
THE FOLLOWING STEPS ARE FOR 5" DRIVES.
[ ] Install a 24K resistor (Red-Yellow-Orange) at R1
(1A).
[ ] Install a 39K resistor (Orange-White-Orange) at
R3 (1A).
[ ] Install a 36K resistor (Orange-Blue-Orange) at
R4 (1A).
[ ] Install an 8.2K resistor (Grey-Red-Orange) at R6
(OL).
Kommentare zu diesen Handbüchern